GMS24 ENERGY LAB
Energy arbitrage
Historical PSE prices · battery simulation
Algorithm
Repeat every day Europe/Warsaw
01Rule 1
02Rule 2
How do the rules work?
Daily, Europe/Warsaw. Maximum available power up to the SOC limit; WAIT outside these hours. End times are exclusive. Windows may cross midnight but cannot overlap. Apply edits with the run button.
Both algorithms start and end the full period at the same SOC. Manual rules may curtail final scheduled operations to restore initial SOC. Prices only settle manual results; they do not choose actions.
Simulation assumptions
Manual rules: Daily, Europe/Warsaw. Maximum available power up to the SOC limit; WAIT outside these hours. End times are exclusive. Windows may cross midnight but cannot overlap. Apply edits with the run button. Both algorithms start and end the full period at the same SOC. Manual rules may curtail final scheduled operations to restore initial SOC. Prices only settle manual results; they do not choose actions.
GMS24 algo
At simulated 14:30 each day, the controller receives all next-day prices and replans through the end of tomorrow. No API failures or publication delays. Hourly products accept the new plan from 15:00. Initially only the first day's prices are known.
Dynamic programming on a finite SOC grid gives an approximate result. The configured target applies at each planning horizon; the full simulation ends at its initial SOC. No future annual price knowledge. Own configurations and efficiencies are assumptions, not hardware certification.
Battery limits are DC; inverter and grid limits are AC. Auxiliary demand is a constant AC load. Cycles = DC discharged energy / nominal capacity, without a cycle cap or capacity-aging model. Import = SDAC + surcharge; export = SDAC × resale factor − deduction. Negative prices are preserved. Wear is charged per DC kWh discharged.
Results exclude equipment purchase, tax and fees not entered. 2026 is partial. A contract settling imports and exports at published prices is assumed; this is not bidding into a closed day-ahead auction. No PV, building load or excess-power penalties. Grid limits are hard constraints.